4,171 successful hires! Ground improvement methods that protect land value.

No artificial materials left underground! Achieve improved strength, liquefaction countermeasures, and asset value protection with ground improvement using natural stones!

The "Eco-GEO Method" is a ground improvement technology that uses only crushed natural stone, without the use of cement or steel pipes. To ensure consistently stable quality and strength, it features the use of a uniquely developed EG casing (a cylindrical device) that is not used in other crushed stone methods. 1. Contributes to the preservation of the global environment 2. Protects the value of land 3. Strength does not deteriorate 4. Measures against liquefaction during earthquakes 5. Two types available: with and without soil removal 【Achievements and Adoption Numbers (as of March 2024)】 ■ Construction agents: 58 locations ■ Housing companies that have adopted it: 4,171 companies ■ Total number of constructions: 34,449 cases *For more details, please download the PDF or feel free to contact us.

  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Contributing to a clean site: Zero waste and zero leftover soil ground improvement method.

Introduction to the Eco-GEO Method (Standard Type) and Eco-GEO ZERO Method (No Soil Discharge Type)!

We would like to introduce our residential crushed stone ground improvement work, "EcoGeo Method." With the EcoGeo Method (standard type), no waste (such as empty cement bags or cut steel pipes) is generated during construction, and no artificial materials are left underground. Furthermore, with the EcoGeo ZERO Method (no soil discharge type), no surplus soil is generated during excavation, allowing us to achieve "zero waste and surplus soil" from the construction phase into the future. 【Methods】 ■ EcoGeo Method (standard type) ■ EcoGeo ZERO Method (no soil discharge type) *For more details, please download the PDF or feel free to contact us.

  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Cost reduction: Ground improvement method with a shorter design length than conventional method support piles.

The design length is shorter than that of conventional solid piles! Compared to other methods, it may also reduce the overall construction cost.

The Eco-GEO method is a replacement method rather than a support pile method. The weight supported by the "crushed stone reinforcement body" is distributed underground, so it does not require a solid foundation at the tip, and in many cases, the design length is shorter than that of conventional solid piles. Therefore, depending on the ground conditions, it may be possible to reduce the overall construction cost compared to other methods. 【Features】 ■ Supports the weight of the building with both the "crushed stone reinforcement body" and the "original ground" ■ Does not require a solid foundation at the tip ■ In many cases, the design length is shorter than that of conventional solid piles ■ Depending on the ground conditions, it may be possible to reduce the overall construction cost compared to other methods *For more details, please download the PDF or feel free to contact us.

  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ground improvement method that can reduce the burden on site managers and contribute to shortening construction periods.

Quality control is completed simultaneously with the completion of construction! There is no need to wait for the confirmation of the strength of the test pieces.

We would like to introduce our residential crushed stone ground improvement work, "Eco Geo Method." Since there is no need for a curing period, construction time can be shortened. No water is used during the construction. As the material is crushed stone, there is no need for level management of the pile heads. Additionally, there is no concern about damaging the pile heads during foundation excavation. 【Features】 ■ No curing period required ■ Can be constructed without water ■ No post-testing (test pieces) required ■ No level management of pile heads needed *For more details, please download the PDF or feel free to contact us.

  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration